CIVIL CONSTRUCTION

Civil and Structural

Construction of building ground beams
Completed precast base
Preparation for wall casting
85% completion

RC Foundations for Steel Structures

Equipment Foundation
Inclinator foundation
Pipe rack foundation c/w anchor bolt
Pipe rack foundation

Irrigation Pits

Construction of precast lifting pit base
Completed precast base
Precast base placed at 6.0 m below ground
Continuation of lifting pit

Drainage Works

Drainage work
Laying of Precast ‘U’ drain
‘U’ Dain size 1800mm x 2100mm
Precast ‘U’ drain with cover

Pavement Works

Subgrade preparation
FDT / CBR Test
Preparation for wall casting
Asphalt Finishing
Interlocking pavement finishing

Track Works EMRAIL